Age | Commit message (Collapse) | Author |
|
//TODO: Find material for LuV coils.
|
|
Heating coils moved to separated block.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
fuel values
|
|
|
|
Make processing array handle multiple input stacks at a time
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Large Diesel Generator
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
experimental
|
|
|
|
|
|
Turbine casing rebalance
|
|
|
|
|
|
|
|
This reverts commit ddc0c4299e8d3c703b6b93f876ce38f961d08236.
|
|
Added 3 new turbine casings to rebalance the turbines. Also changed
turbine controller recipes to fit the rebalance.
Large Steam: Steel Turbine Casing
Large HP Steam Turbine: Stainless Steel Turbine Casing
Large Gas Turbine: Steel Turbine Casing
Large Diesel Turbine: Titanium Turbine Casing
Large Plasma Turbine: Tungstensteel Turbine Casing
|
|
|
|
|
|
|
|
|
|
out of date. :)
|